Salland's Adventure Zoo - Update 15/11/2021

  • 135 replies
  • 15750 views
*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 09/08/2021
« Reply #120 on: August 09, 2021, 10:03 AM »
The street is now decorated with foliage. A new container will also be placed by the rest of the underground waste container, which is intended for paper.

The bollards have been placed so that no traffic can enter the square. The stores can only be stocked at certain times.

I have also added some details to the hotel. I did this because I found the wall a bit boring.
-----------------------------------------------------------------------------












-----------------------------------------------------------------------------

« Last Edit: August 30, 2021, 10:41 AM by Think Creative »

*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 16/08/2021
« Reply #121 on: August 16, 2021, 10:00 AM »
I updated the map with the new DLC “Africa Pack”. I waited with this update because I wanted to finalize the hotel and surroundings.

I have replaced some fencing with the new wire mesh fencing. I didn't do all the fencing because some fences look better with the habitat barriers.

I have changed the wall tiles in the Wellness areas with the new tiles. This gives a better tile structure. I did not do the floor tiles because they have a rough structure and this makes the floor less slippery.

The steam bath and massage room have now been given mosaic tiles. A water element has also been placed in the steam bath with matching mosaic tiles.
-----------------------------------------------------------------------------












-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 23/08/2021
« Reply #122 on: August 23, 2021, 10:01 AM »
After finishing the interior of the hotel, I felt that the pet clinic needed an interior as well. I have decided not to make an entire interior, but only the part that can be seen from the outside. The hotel and pet clinic are the only two buildings outside the zoo what have an interior so far.
-----------------------------------------------------------------------------







-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 30/08/2021
« Reply #123 on: August 30, 2021, 10:00 AM »
In this update I added some details to the ceiling. This includes air conditioning systems and lighting. The pet clinic has also been given a reception and checkout area.
-----------------------------------------------------------------------------






-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 06/09/2021
« Reply #124 on: September 06, 2021, 09:59 AM »
The pet clinic is now fully furnished. Part of this room has been divided into a waiting area for the four examination rooms. The other part has become a shop. In this shop one can only buy special food for their pets.
-----------------------------------------------------------------------------










-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 13/09/2021
« Reply #125 on: September 13, 2021, 10:00 AM »
In this update I show the global layout around the tunnel. On one side there will be a parking lot for the hotel and on the other side the
maintenance room for the tunnel.
-----------------------------------------------------------------------------









-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 20/09/2021
« Reply #126 on: September 20, 2021, 10:00 AM »
In this update I've been working on the tunnel. At the moment there is little to see. The tunnel has been fenced off for safety and security.
-----------------------------------------------------------------------------






-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 27/09/2021
« Reply #127 on: September 27, 2021, 10:00 AM »
The tunnel is now fully completed. This part actually looks the same as on the other side of the tunnel. And by this I mean the crash barriers and boom barriers.
-----------------------------------------------------------------------------






-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 04/10/2021
« Reply #128 on: October 04, 2021, 10:00 AM »
The local fast food entrepreneur has been taken over by a large fast food chain.

The hotel will have its own parking lot. The parking spaces are only available for hotel guests who have booked a room. The other visitors can park their car in the nearby parking garage.
-----------------------------------------------------------------------------







-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 11/10/2021
« Reply #129 on: October 11, 2021, 12:59 PM »
The hotel has reserved a number of parking spaces for disabled people and EV parking spaces. A number of trees have also been placed.
-----------------------------------------------------------------------------










-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 18/10/2021
« Reply #130 on: October 18, 2021, 10:01 AM »
The parking lot is only accessible through the barriers. If you want to use a parking space, this is done when booking the hotel room.

A wall has been built around the parking lot, so that people can't see into the zoo, but it also reduces the noise coming from the zoo. There is also an emergency exit for the zoo in this wall.

One side of the wall is not yet detailed because I don't know at this point what function or theme this wall will have.
-----------------------------------------------------------------------------









-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 25/10/2021
« Reply #131 on: October 25, 2021, 10:02 AM »
The basis for the maintenance rooms has been built. The power supplies for the fans in the tunnel will be located in the largest room.

The separate room is intended for the control room, which is manned 24/7.
-----------------------------------------------------------------------------







-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 01/11/2021
« Reply #132 on: November 01, 2021, 11:00 AM »
The tunnel maintenance area is now further detailed. For example, the control room has been given doors and windows.

The room for the power supplies is now equipped with its own fire protection system. This is located on the outside of the building, making it easily accessible for the fire brigade.
-----------------------------------------------------------------------------










-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 08/11/2021
« Reply #133 on: November 08, 2021, 10:00 AM »
The area around the tunnel maintenance area is now planted with foliage.

Above the ventilators in the tunnel I placed some larger ventilators. These ensure that air is blown into the tunnel, but toxic smoke and vapors can also be extracted from the tunnel in the event of an emergency.
-----------------------------------------------------------------------------









-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 15/11/2021
« Reply #134 on: November 15, 2021, 10:00 AM »
The next area I'll be working on is the w Pedestrian and cyclists Bridge. At the moment, it's a basic layout. I can already tell that this is going to be a very difficult build.
-----------------------------------------------------------------------------









-----------------------------------------------------------------------------


*

Offline Think Creative

  • *
  • 213
  • shyguy's World Rocks!
    • View Profile
Salland's Adventure Zoo - Update 22/11/2021
« Reply #135 on: November 22, 2021, 10:00 AM »
In this update I have neatly finished the retaining wall of the bridge and future cycle path. It was a difficult job.
-----------------------------------------------------------------------------







-----------------------------------------------------------------------------